GS Property LLC

Guide for investors who live outside the U.S. · Updated November 15, 2026

Florida building permits for renovating a house when you invest from abroad

In a Florida fix & flip, permits are checked before buying and pulled before any wall is opened. An open permit or unpermitted work passes to the new owner with the house; the work is permitted by a state-licensed contractor, because the owner-builder exemption is meant for people building for themselves, not to sell; and before the first inspection the Notice of Commencement must be recorded and posted at the job site.

Request my evaluation Book a 30-minute call

The answer in one sentence

Check the house for open permits and unpermitted work before you sign, let a Florida-licensed contractor pull the renovation permit, and close every permit with its final inspection before selling, so the sale does not stall in the buyer’s title search.

Before buying: what the house inherits from the previous owner

Who pulls the permit: a licensed contractor

Florida law lets an owner pull a permit as an “owner-builder” on their own one- or two-family home, but the owner must personally supervise on site all work not done by licensed contractors and cannot delegate that supervision. In addition, if the owner sells or offers the house for sale within one year after completing the work, the law presumes it was built for sale, which is exactly what the exemption does not cover (Florida Statutes 489.103). That is why in a fix & flip, especially when the investor lives abroad, the permit is pulled by a state-licensed contractor.

Verify the contractor’s license in the Florida Department of Business and Professional Regulation (DBPR) registry and ask for liability and workers’ compensation insurance certificates; see how to verify a fix & flip company and insuring the house during the renovation.

The permit, step by step

  1. Scope and plans

    Define what changes: kitchen, bathrooms, roof, windows, electrical, plumbing, air conditioning. Anything touching structure, roof, windows or building systems needs a permit; many purely cosmetic jobs do not, but each city’s building department sets the list.

  2. Application and plan review

    The contractor submits the application with plans or specifications. Florida law also allows the owner to hire, separately, an authorized private provider for plan review and inspections (Florida Statutes 553.791).

  3. Notice of Commencement

    Before work starts, the owner records the Notice of Commencement with the county and posts a copy at the job site before the first inspection. It expires one year after recording unless another date is set; paying after it expires can make the owner pay twice for the same work (Florida Statutes 713.13).

  4. Inspections during the work

    Each stage (structure, electrical, plumbing, roof) is inspected before walls or ceilings are closed. A failed inspection is corrected and requested again, which is why permits and inspections are among the biggest drivers of how long a house flip takes.

  5. Final inspection and permit closure

    With the final inspection approved, the permit is closed. An open permit shows up in the buyer’s pre-closing searches and can delay the sale or kill it. See title insurance and the title company.

Miami-Dade, Broward and hurricane rules

Miami-Dade and Broward are in the High-Velocity Hurricane Zone of the Florida Building Code: roofs, windows and exterior doors must be products approved for that zone and are installed with a permit. Doing it right pays twice: it passes inspection and it can improve the wind mitigation inspection the final buyer uses for their insurance.

Informational content based on Florida Statutes 489.103 (owner-builder), 713.13 (Notice of Commencement) and 553.791 (private provider), Miami-Dade County’s page on buying and selling homes and its permit search, and the DBPR license registry, accessed November 15, 2026. Requirements change by city and type of work: confirm them with the building department and a licensed contractor.

How GS Property works

GS Property LLC buys, renovates and sells homes (fix & flip) in Florida and Texas on behalf of investors who live in and outside the U.S. The property is titled in the investor’s name or their LLC, never ours; permits are pulled by a licensed contractor and the renovation is shown step by step in photos and video. We do not give legal advice. The profit is not guaranteed; see the risks of house flipping, including permit delays.

Frequently asked questions

Do you need a permit to renovate a house in Florida?

Yes for almost anything that touches structure, roof, windows and exterior doors, electrical, plumbing or air conditioning. Some purely cosmetic jobs, such as painting, do not need one, but each city or county sets the list: confirm it with your building department before starting.

What happens if I buy a house with an open permit?

The permit stays attached to the property, not to the person who pulled it, so the buyer inherits it. Ideally the seller closes it with its final inspection before closing, or it is negotiated in the contract. That is why it pays to search the address’s permits before making an offer.

Who pays if the house has unpermitted work?

The new owner. Miami-Dade County states that whoever buys a property is responsible for correcting illegal construction and its fines if it is detected later. That is why a contractor, architect or engineer should review the house before buying.

Can I pull the permit myself as the owner?

Florida law allows an owner-builder permit on a one- or two-family home, but the owner must personally supervise all work not done by licensed contractors, and if the owner sells or offers the house for sale within one year after completing the work, the law presumes it was built for sale (Florida Statutes 489.103). In a fix & flip the permit is usually pulled by a licensed contractor.

What is a Notice of Commencement?

It is a document the owner records with the county before work starts, with a copy posted at the job site before the first inspection. It protects the owner against claims from subcontractors and suppliers. It expires one year after recording unless another date is set, and paying after it expires can make the owner pay twice for the same work (Florida Statutes 713.13).

Do permits delay a fix and flip?

They can: plan review and inspections depend on the city, and a failed inspection is corrected and requested again. Florida law allows hiring, separately, an authorized private provider for plan review and inspections (Florida Statutes 553.791). The project plan must include this time.

Does GS Property pull the permits?

Each project’s permits are pulled by a Florida state-licensed contractor, and each permit is closed with its final inspection before selling. The property stays in the investor’s name or their LLC.

Want to see how a renovation is planned before investing?

Tell us where you invest from, your timeline and your goal. We show you how we review the permits, scope and timing of each house; if a flip is not right for you, we will tell you.

Request my evaluation Book a call